Discuss farm sites without mains power

Plan measurements at farm water points and field plots where power, radio coverage and maintenance visits are limited.

Useful facts for the review

  • What must be known between visits, and how often can the site be maintained?
  • What power, shade, seasonal weather and mounting conditions are known?
  • Which country, radio/network availability and reporting interval apply?

From requirement to a defined pilot

  1. A measurement and visit-interval brief for each farm point.
  2. A conditional power/communication proposal with the assumptions visible.
  3. A field pilot with battery/solar observations, missing-data checks and maintenance criteria.

Conditions to confirm

  • Battery life and solar autonomy are calculated for the proposed configuration; they are not universal promises.
  • Radio coverage, seasonal shading and sensor load require site evidence.
  • Local logging and recovery after a link outage are confirmed for the selected model and platform.

Discuss off-grid farm measurements.

A work email helps, but is not required. Unknown quantity is fine. A cabinet, panel or site photo is the most useful attachment.

  • How often someone can visit.
  • What must still be known between visits.
  • Battery, solar, or still unknown.
  • Country or region, for radio band later.

You can also email contact@sungeneiot.com. Same company as sungeneiot.com.

A person at SunGene replies by email. Price, enclosure and certificates come later, in a quotation.

Other agricultural operating conditions

Worksheets and existing project guidance